Southern Dredging Logo

Our Blog

Dredging News and Updates

Breakwaters Shoreline Protection

Breakwaters Shoreline Protection

Aug 7, 2018 | 0 Comments

Breakwaters Shoreline Protection Breakwaters can be constructed with one end linked to the shore, in which case they are usually classified as sea walls; otherwise they are positioned offshore from as little as 100 m up to 300–600 m from the original shoreline. There...

Maintenance Dredging

Maintenance Dredging

Aug 7, 2018 | 0 Comments

Maintenance Dredging involves the removal of unwanted silt, sand or sludge from existing waterways that are already dredged at some earlier point. It is usually somewhat shallow and is performed by a hydraulic cutterhead dredge and involves depths from 3' to 30' in a...

Older Entries

Recent Post

  • Breakwaters Shoreline Protection
  • Maintaince Dredging
  • Marinas, Rivers & Lake Dredging

Our services

  • Dredging
  • Geotextile Tubes
  • Breakwaters
  • Hydrographic Surveys
  • Pile Driving
  • Contact Us

Get a Free Quote

Contact us to learn more about our services and get a